You don't have javascript enabled. Good luck with that.
Pencarian
Lima Sumur Resapan Dibangun di Depan Gedung BPKP RI

Five Infiltration Wells Construction on Jl. Pramuka Reaches 90 Percent

Process of constructing five infiltration wells on Jalan Pramuka, Utan Kayu Utara, Matraman, East Jakarta has reached 90 percent.

We build it manually starting October and now its process reaches 90 percent

Matraman Water Resources (SDA) Sub-agency Unit Head, Erland Sianipar conveyed, those five infiltration wells are located in front of BPKP RI Building.

"We build it manually starting October and now its process reaches 90 percent. It is estimated to finish next week," he explained, Tuesday (11/10).

Three Infiltration Wells Built in Utan Kayu Utara Urban Village

His side deployed 10 personnel from Matraman Sub-district SDA Unit to build infiltration wells with depth 3 meters and 1 meter.

"These five infiltration wells are built to anticipate inundation in rainy season," he closed.

Linked News
Popular News indeks
  1. Rano Reaffirms Jakarta's Vision of Becoming a City of Cinema

    access_time22-10-2026 remove_red_eye5503 personBudhi Firmansyah Surapati
  2. Jakarta Provincial Government Receives a Grant of Rp 9.6 Billion in KPK`s Seized Assets

    access_time20-10-2026 remove_red_eye4631 personDessy Suciati
  3. Drainage Channels Along Two Rawajati Roads Dredged

    access_time21-10-2026 remove_red_eye1841 personTiyo Surya Sakti
  4. Check Saturday's Traffic Diversions for Jakarta Running Festival

    access_time23-10-2026 remove_red_eye833 personAldi Geri Lumban Tobing
  5. MRT Jakarta Prolongs Weekend Service for Kanye West Concert

    access_time23-10-2026 remove_red_eye718 personAldi Geri Lumban Tobing